PRODUCT CODE // 06 · BS ENERGY CHENNAI

Heat Recovery Systems Manufacturer in India

Heat Recovery Systems·Also known as: Waste Heat Recovery System · Exhaust Heat Recovery Unit · Economizer · Flue Gas Heat Recovery System
PAN INDIA & EXPORTEST. 2007
ENGINEERING VIEW
01 / 04
Heat Recovery Systems — Structural Engineering Fabrication
Structural Engineering FabricationAUTHENTIC SITE SPECIFICATION
MANUFACTURING FACILITYSHOLAVARAM, CHENNAI
COMPLIANCE STANDARDINDUSTRIAL QUALITY ASSURED
DISPATCH / DELIVERYPAN INDIA & GLOBAL EXPORT
TECHNICAL SUPPORT24/7 ERECTION & AMC SERVICE

Industrial Heat Recovery Systems (WHRU) & Economizers Overview

BS Energy India manufactures high-performance Waste Heat Recovery Units (WHRU), boiler economizers, and air preheaters (APH) designed to capture waste thermal energy from stack exhaust gases and recycle it back into the plant energy cycle. Manufactured in Sholavaram, Chennai, our heat recovery units help industrial plants dramatically cut fuel consumption and carbon footprint.

In industrial boilers, thermic fluid heaters, and furnaces, flue gases frequently exit the stack at temperatures between 200°C and 450°C+, carrying away as much as 10% to 20% of the fuel's total heat value. A waste heat recovery unit installs in the flue gas path to extract this sensible heat and preheat boiler feedwater or combustion air. Every 6°C rise in boiler feedwater temperature cuts fuel consumption by approximately 1%, providing a rapid return on energy investment.

KEY TECHNICAL ADVANTAGES

Substantial fuel consumption savings
Finned tube heat exchanger design
Durable stainless / alloy steel construction
Quick return on energy investment

Metallurgy & Heat Transfer Surface Options

Seamless Carbon Steel Tubes (ASTM A106 Gr. B) with high-frequency welded solid finsStainless Steel Tubes (SS 304 / SS 316) for acidic flue gas corrosion resistanceSerrated vs. solid fin profiles engineered for optimum heat transfer vs. draft lossHeavy-duty insulated casing with removable inspection panels for cleaning
WHATSAPP ENQUIRYCALL DESK
EQUIPMENT CONFIGURATIONS

Heat Recovery Equipment We Manufacture

VARIANT // 01

Finned-Tube Boiler Economizers

Compact heat exchangers with spiral-finned steel tubes that preheat boiler feedwater using flue exhaust heat, boosting overall boiler efficiency.

VARIANT // 02

Flue Gas Air Preheaters (APH)

Tubular heat exchangers that preheat incoming combustion air before it enters the burner, accelerating flame ignition and improving thermal efficiency.

VARIANT // 03

Thermic Fluid Waste Heat Recovery Units

Recovers high-grade exhaust heat from kilns or furnaces to heat secondary thermic oil loops for process departments.

VARIANT // 04

Process Water Heat Exchangers

Captures flue gas sensible heat to supply continuous hot water for process washing, CIP systems, or plant boiler makeup tanks.

ENGINEERING SPECIFICATIONS

Sizing Criteria & Engineering Inputs

WHRU and economizer sizing requires balancing thermal heat transfer against the maximum permissible flue gas backpressure on the existing burner and boiler. Key enquiry parameters include:

Flue gas exhaust temperature at stack inlet (°C) and volumetric flow (Nm³/hr or kg/hr)
Heat recovery medium: Boiler feedwater, makeup water, or combustion air
Feedwater flow rate (m³/hr or kg/hr) and inlet water temperature (°C)
Maximum allowable flue gas pressure drop / draft loss (mm WC or mbar)
Source equipment details: Boiler steam capacity (TPH), thermic fluid heater kcal/hr, or furnace fuel type
Need engineering consultation or site sizing review?
APPLICATIONS

Applications of Waste Heat Recovery

Industrial Steam Boiler Feedwater Preheating (Economizers)
Thermal Fluid Heater Stack Energy Recovery
Ceramic, Tunnel Kiln & Annealing Furnace Flue Capture
Incinerator & Thermal Oxidizer Exhaust Heat Utilization
Chemical & Textile Plant Energy Efficiency Retrofits
SECTORS

Industries Served

Heat Recovery Systems is installed and operating across diverse continuous manufacturing facilities:

AUTOMATION & INTERLOCKS

System Features & Bypass Dampers

Modulating flue gas bypass damper enabling maintenance without boiler shutdown
Inlet and outlet dial/digital temperature indicators for water and flue gas
Safety pressure relief valve on economizer water piping circuit
Soot blower ports or manual cleaning doors to prevent ash accumulation
Differential pressure transmitter to monitor flue gas backpressure
INSTALLATION & COMMISSIONING SCOPE
  • ›Flue gas ductwork modification and expansion joint installation
  • ›Rigging and mounting economizer unit onto structural support stand
  • ›Feedwater line tie-in: connecting feed pumps, check valves, and bypass piping
  • ›Thermal performance verification: measuring stack temperature drop and fuel savings
MAINTENANCE, SPARES & AMC SUPPORT
  • ›Soot removal and fin tube bundle pressure washing service
  • ›Replacement finned tube spools and high-temperature gaskets
  • ›Annual thermal audit and heat transfer performance recertification

WHY CHOOSE BS ENERGY INDIA FOR HEAT RECOVERY SYSTEMS

Demonstrated fuel consumption savings of 5% to 15%+
Rapid payback period (typically 6 to 18 months based on fuel usage)
Engineered low draft loss preserving existing burner combustion stability

Frequently Asked Questions

How much fuel can an industrial boiler economizer save?+

A properly sized boiler economizer typically saves 5% to 10%+ in fuel consumption. As a rule of thumb, every 6°C rise in feedwater temperature reduces fuel consumption by approximately 1%.

Will installing a waste heat recovery unit create backpressure on my burner?+

We engineer economizers with optimized tube spacing and fin geometry to keep draft loss within your existing burner fan's allowable backpressure limits. Where necessary, we provide booster draft fans.

Can an economizer be retrofitted onto an existing industrial boiler?+

Yes. We frequently retrofit economizers into existing boiler houses across Chennai and India, designing custom duct transitions and feedwater bypass piping.

ABOUT BS ENERGY INDIA

BS Energy India is a manufacturer & exporter, established in 2007, operating from Sholavaram, Chennai, Tamil Nadu, India. We supply Heat Recovery Systems alongside our wider industrial heating, combustion, piping and fabrication range across India and to export markets.